📢 Gate广场 #NERO发帖挑战# 秀观点赢大奖活动火热开启!
Gate NERO生态周来袭!发帖秀出NERO项目洞察和活动实用攻略,瓜分30,000NERO!
💰️ 15位优质发帖用户 * 2,000枚NERO每人
如何参与:
1️⃣ 调研NERO项目
对NERO的基本面、社区治理、发展目标、代币经济模型等方面进行研究,分享你对项目的深度研究。
2️⃣ 参与并分享真实体验
参与NERO生态周相关活动,并晒出你的参与截图、收益图或实用教程。可以是收益展示、简明易懂的新手攻略、小窍门,也可以是行情点位分析,内容详实优先。
3️⃣ 鼓励带新互动
如果你的帖子吸引到他人参与活动,或者有好友评论“已参与/已交易”,将大幅提升你的获奖概率!
NERO热门活动(帖文需附以下活动链接):
NERO Chain (NERO) 生态周:Gate 已上线 NERO 现货交易,为回馈平台用户,HODLer Airdrop、Launchpool、CandyDrop、余币宝已上线 NERO,邀您体验。参与攻略见公告:https://www.gate.com/announcements/article/46284
高质量帖子Tips:
教程越详细、图片越直观、互动量越高,获奖几率越大!
市场见解独到、真实参与经历、有带新互动者,评选将优先考虑。
帖子需原创,字数不少于250字,且需获得至少3条有效互动
Ethereum’s Fusaka upgrade set for November, Glamsterdam planning next
Ethereum core developers have tentatively chosen November to release the protocol’s next major hard fork, called Fusaka, aimed at making the network more efficient and scalable.
Meanwhile, feature upgrades in the Glamsterdam hard fork, the next upgrade after Fusaka, are set to be confirmed on Aug. 1.
The Ethereum community has been pushing for more frequent and faster upgrades for the protocol. The upgrade timeline would place Fusaka six months after the most recent Ethereum hard fork, Pectra, which introduced account abstraction, increased the validator staking limit, and made layer-2 networks more efficient.
According to ethPandaOps, a community dedicated to improving the Ethereum network, the Fusaka hard fork will release its next devnet on Wednesday, with 11 Ethereum improvement proposals to be included.
One of these includes EIP-7825, which aims to make the network more resilient to malicious attacks while also scaling the network.
Ethereum core developers have also proposed to raise Ethereum’s gas limit to 150 million.
However, to speed up the testing process, EIP-7907, which would double the contract code size limit and introduce gas metering, has been removed.
In April, Ethereum core developer Tim Beiko stated that the controversial EVM Object Format upgrade will also not be a part of the Fusaka upgrade.
Two public testnets are set to follow in September and October, with the final launch of the Fusaka hard fork in early November.
“If we want to ship by Devconnect, we need our timeline TIGHT. We’ll go over that in detail. Can we get client releases in the ~next month & a half?” Nixo said.
Devconnect will take place from Nov. 17 to Nov. 22 in Buenos Aires, Argentina.
The tentative deadline for Fusaka comes as Ethereum core developers prepare to gather feedback for the Glamsterdam hard fork.
The upgrades that will make it into the hard fork will be announced during the next AllCoreDevs - Execution meeting, which will be held on Aug. 1.
Related: Vitalik Buterin’s vision for Ethereum: Pectra, Glamsterdam and beyond
Recent proposed upgrades
Ethereum core developer Barnabé Monnot said that the Ethereum network should reduce the block time from the current 12 seconds to six seconds. According to Monnot, this will greatly improve the user experience and make DeFi DApps more efficient.
If approved, the upgrade will be rolled out with the Glamsterdam hard fork, which is scheduled to release sometime in 2026.
Meanwhile, Ethereum validators have signalled their support for raising the network’s gas limit to 45 million, which will reduce transaction costs and improve network scalability.
In an X post on Sunday, Ethereum co-founder Vitalik Buterin stated that “Almost exactly 50% of stake is voting to increase the L1 gas limit to 45m.”
Magazine: Will Robinhood’s tokenized stocks REALLY take over the world? Pros and cons